sa国际传媒

Skip to content
Join our Newsletter

Les Leyne: Ferry contracts are different this time

Groping around for an argument on the last day of the legislative sitting, the New Democrats seized on a startling topic: ferry-building.

Groping around for an argument on the last day of the legislative sitting, the New Democrats seized on a startling topic: ferry-building.

Given the party鈥檚 track record when it comes to building ferries 鈥 which is: Three swings, three spectacular misses 鈥 it was a startling choice. It has been 13 years since the fast-ferry experiment sank under the weight of its own incompetence, but the memories are still vivid.

You鈥檇 think the topic would be marked in the Opposition files under the heading 鈥淪till Too Soon.鈥

The NDP criticizing a ferry-building project is like the Vancouver Canucks teaching a course in goaltender management.

But the temptation was irresistible, given the setup. sa国际传媒 Ferries needs three intermediate-class ferries and this week got the OK from the ferry commissioner to build them.

The NDP has been stung by criticisms that their election campaign failed to show the slightest interest in jobs. So the obvious line of attack involved where the ferries will be built. The Opposition is primed for a reprise of the argument nine years ago that erupted after sa国际传媒 Ferries stiffed local shipyards and went to Germany to get the three coastal-class vessels built.

The NDP took part then in a concentrated campaign against that decision. It didn鈥檛 change the company鈥檚 mind, but it did sensitize people to the issue. This time, though, it looks as if they are getting ahead of themselves.

The entire round of questions and criticisms this week was devoted to the theme that the sa国际传媒 Liberals are going to stand idly by and do nothing while sa国际传媒 Ferries goes offshore again to get ferries built.

NDP Leader Adrian Dix said sa国际传媒 jobs come number two.

鈥淵ou either believe we should build ships in sa国际传媒 or you don鈥檛.鈥

Opposition MLA Gary Holman chimed in, accusing the Liberals of turning their backs on the opportunity to build family-supporting, tax-contributing jobs in sa国际传媒

From the general tone, you鈥檇 think the deal was done and those German welders were already clocking in what should have been sa国际传媒 jobs.

But all that鈥檚 happened so far is that the company has said it needs three ships. And in fact, it鈥檚 specifically invited 鈥淐anadian and international shipyards鈥 to bid on the jobs.

The NDP campaign seems to be based on the idea that the government and the corporation should have slammed the door and confined the bidding process to just sa国际传媒 yards.

But that doesn鈥檛 sound like a particularly sound way to keep the bids competitive. In fact, it would amount to gift-wrapping the opportunity and delivering it to the sa国际传媒 yards on a silver plate.

The line of questioning also seems to assume that an offshore yard will automatically beat local yards.

Not so fast. It鈥檚 a whole different story this time around.

The ferries needed are scarcely half the size of the coastal-class ships that were built in Germany. Ships with 125- to 145-car capacity are much more within the range of sa国际传媒 yards. The most recent ferry order was that size, and it was built locally, in 2008.

And Seaspan and other yards are beefed up compared to where they were nine years ago. Seaspan is well into a $180-million upgrade of its yard in preparation for its share of the long-term federal contract it won.

There are a small handful of sa国际传媒 yards that could bid on the ferry work and win the job. It depends a bit on the timing, particularly in Seaspan鈥檚 case, since it would have to coincide properly with the rollout of the contracts the federal government will be letting.

The one question mark is the idea of powering them with liquefied natural gas, which is being considered.

That would be a novelty for the local shipyards. But it鈥檚 not as if they have to build LNG units. They just have to install them.

LNG-powered engines would be components you buy like any other.

They would make it more complex and expensive, but hardly impossible.

We are still several steps away from taking to the streets again to protest foreign-built ferries. And the landscape is so different now, there鈥檚 an even chance there will be no need to do so.